Sam

This was my Knitting Olympics project. I worked on this almost exclusively for the entire duration, and was rewarded with a quick sweater!

Started February 10, 2006

Completed February 25, 2006

7.75 hours for the back, 5.25 hours for the right front, 4.75 hours for the left front, 6.5 hours for each sleeve, 3 hours for seaming and weaving in ends, 4.25 hours for the collar, and 2.75 hours for the zipper installation for a total of 40.75 hours.

 

Pattern name: Sam, Cotton Angora book
Designer: Debbie Bliss
Needles: US 7 Addi Turbos
Modifications: Added length at the waist and right before the armhole shaping
Yarn: A little over 5 skeins of Lion Brand Cotton-Ease in Bubblegum Pink

Next project >>